revolusi2Avatar border
TS
revolusi2
Construction for the Second PKR 10514 Frigate
Construction for the Second
PKR 10514 Frigate to Start
in Next 3 Months
22 April 2014


Sigma PKR 10514 frigate
(image : Acelanceloet)

Damen Schelde Naval Shipbuilding Lays Keel for First Sigma 10514 PKR Frigate In accordance with the agreed planning in the contract for the construction of a Damen SIGMA Frigate for the Indonesian Navy, the keellaying ceremony has taken place on 16 April 2014 at the PT PAL (Persero) Shipyard in Surabaya,Indonesia.

The construction of the 4 modules that are going to be built at PT PAL (Persero) Shipyard Surabaya and the two modules that are being built in Vlissingen, are proceeding according to schedule The construction and testing of the modules simultaneously at two different locations signifies the unique Damen Schelde Naval Shipbuilding modular building strategy that is unparalleled in the naval shipbuilding industry. All modules will be assembled at the PT PAL (Persero) Shipyard under main contractorship of Damen Schelde Naval Shipbuilding followed by Harbour Acceptance Tests and Sea Acceptance Trials.

Second Frigate Furthermore, the progress for the second SIGMA 10514 PKR frigate, for which the contract was signed 14 February 2013, proceeds as scheduled and
construction is foreseen to start in approximately 3 months.

Expanding Indonesian Navy
The acquisition of the SIGMA
10514 PKR Frigate is part of the further modernization and
expansion of the Indonesian
Navy, TNI-AL. The main missions and tasks of the SIGMA PKR 10514 will be in the domains of naval warfare as well as Maritime Security missions and tasks. Also, the ship may be used for humanitarian support tasks.

[url] http://defense-studies.blogspot.com/2014/04/construction-for-second-pkr-10514.html?m=1 [/url]
Diubah oleh revolusi2 23-04-2014 04:52
0
11.4K
23
Thread Digembok
Urutan
Terbaru
Terlama
Thread Digembok
Komunitas Pilihan